Vision for 2020 Roe BoulevardThe Roe Boulevard Improvement Project is funded with local resources and dollars from the Federal Surface Transportation Program. The project development process involves the following four phases: Visioning, Preliminary Design, Final Design, and Construction.
Roe Boulevard Visioning Final Document 2017 (PDF)Flyover Animation of Roe Boulevard Based on Visioning ProcessRoe Boulevard Traffic Study (PDF)Roe Boulevard Traffic Study Appendix (PDF)
Goals for the Design of Roe Boulevard- 11-6-17 Roe Boulevard Visioning Plan (PDF)Public Meeting Presentation for Roe Boulevard 3-22-2017 (PDF)Community Forum Roe 2020 Presentation 1-29-2018 (PDF)Preliminary Design Plan Sheets Approved by KDOT 09-21-2018 (PDF)Preliminary Design Progress Report 10-01-2018Traffic Engineer Memo Concerning Removal of Signal at 52nd Terr 11-28-2018 (PDF)52nd and Roe Signal Presentation 12-19-18 (PDF)Field Check Plan Sheets as of 02-26-2019 (PDF)Roe Boulevard Line Item Construction Cost Estimate 03-04-2019 (PDF)Roe Boulevard Total Project Cost Estimate 03-04-2019 (PDF)Roe Boulevard Status Update Presentation 03-01-2019 (PDF)Roe Boulevard Total Project Costs Estimate Including Mill and Overlay North of 48th 3-12-19 (PDF)Roe Boulevard Design Plans - Office Check Stage 4-25-19 (PDF)
Final engineering plans and bid documents to be complete by September 2019.Roe Boulevard Design Plans - Office Check Stage 9-30-19All In Cost Estimate as of 1-3-20 (PDF)Planting Plans with Pictures of Proposed Species and Notes Included from Vireo 8-16-19 (PDF)Roe Boulevard Design Plans - Final 2-15-20 (PDF)
Construction to begin early spring 2020 with completion by year end 2020.Roe 2020 Steps to Construction Summary Handout 7-18-19 (PDF)Roe 2020 Steps to Construction Presentation by Larkin 7-18-19 (PDF)